Results 1 to 10 of 28

Thread: CSV Donau

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Guild Expert rdanhenry's Avatar
    Join Date
    Mar 2009
    Location
    California
    Posts
    1,612

    Default

    MAINTENANCE SHUTTLE: "carrying our repairs" s/b "carrying out repairs"
    REPAIR AND FABRICATION BAY: "drafting table allow for" s/b "drafting table allows for"
    LIQUID STORAGE TANKS: "can go and average" s/b "can go an average"

    The VALERIE: "chance" s/b "change"

    Congratulations on a well-thought-out design to the Nova class. That really is amazing. What software are you using and how long does it take you to complete a deck?

  2. #2

    Default

    Quote Originally Posted by rdanhenry View Post
    MAINTENANCE SHUTTLE: "carrying our repairs" s/b "carrying out repairs"
    REPAIR AND FABRICATION BAY: "drafting table allow for" s/b "drafting table allows for"
    LIQUID STORAGE TANKS: "can go and average" s/b "can go an average"

    The VALERIE: "chance" s/b "change"
    Rawr. Annoying typos are annoying. Thanks for pointing them out; I'll change them.

    Quote Originally Posted by rdanhenry View Post
    Congratulations on a well-thought-out design to the Nova class. That really is amazing. What software are you using and how long does it take you to complete a deck?
    It's done completely in GIMP, with a few preliminary sketches to settle the design. The time taken depends a lot on the deck. Decks 1, 2, 5, and 6, for example, took maybe two or three hours. The big decks (3-5), on the other hand, probably took on the order of 15-20 each. I didn't time myself, but next time I will, just to see how much time I've wasted.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •